Owen and Chris's April 2009
Date: 28th April 2009 Approaching the structure, beautiful hazel and willows coming into leaf
|
|
Aaron, Ash and Fin playing inside
Date: 28th April 2009 As you can see, we're still building. Owen has a temporary workbench along one side of this room. But there's still space to get toys out
|
|
Owen and Chris's April 2009
Date: 28th April 2009 Our solar panels catch some afternoon sun. You can see Owen's homemade scaffolding round the side ready to weatherboard the next section
|
|
Owen and Chris's April 2009
Date: 27th April 2009 Up to date photo of the structure showing raised beds to the west
|
|
Owen busy weatherboarding
Date: 1st April 2009 Owen boarding the outside using weatherboard from our own larch, milled on our solar-powered bandsaw. It's a slow process but we'll get there
|
|
Owen's floor is level. A view of the timber in the floor of Chris and Owen's dwelling
Date: 1st May 2008 Except the reclaimed posts, all the timber in the floor is sawn from the trees we felled and planked
|
|
Front view of Chris and Owen's dwelling
Date: 1st May 2008 Two of the 6x6 inch beams have gone up. You can see the recycled double glazing in place too
|
|
Chris and Owen's dwelling - a new interior
Date: 1st May 2008 Suddenly the outside has become the inside!
|
|
Chris and Owen's dwelling - a new interior
Date: 1st May 2008 The view from our bedroom
|
|
Aaron at the building site
Date: 1st May 2008 Aaron loved to be around the site while the timber frame was being built - we couldn't always let him because he needed such close supervision. But he fitted in when he was there!
|
|
Groundwork for the structure - hand built foundations
Date: 1st April 2008 To protect the foundation posts from future waterlogging, a trench was dug at the top of the site and filled with a drainage pipe and rocks. A hole was dug for each post and backfilled with stony soil and rocks
|
|
Groundwork for the structure - hand built foundations
Date: 1st April 2008 Ground posts are of reclaimed oak. These amazing WWOOFers helped to dig the post holes and backfill with soil and rocks. Thanks guys!
|
|
Winching a stump by hand
Date: 1st January 2008 Using a Tirfor winch to remove the larch stump from the structure build site
|
|
Seasoning timber for Chris and Owen's dwelling
Date: 1st December 2007 This pile of logs became Owen and Chris' structure. Winched by hand into a good position for the mobile sawmill
|
|
Owen, Merlin and Seth...
Date: 1st December 2007 ... are men at work
|
|
Tree felling by hand - a tree for Chris and Owen's dwelling
Date: 1st October 2007 Becky hand felling a larch for plankwood
|
|
Tree felling by hand - a tree for Chris and Owen's dwelling
Date: 1st October 2007 Dan using a felling axe to shape the gob cut
|
|
Tree felling by hand - a tree for Chris and Owen's dwelling
Date: 1st October 2007 Owen, Daz and Tim the WWOOFer using a crosscut saw to fell a larch for plankwood
|
|
Site of Owen and Chris' structure
Date: 1st September 2007 The site of Owen and Chris' dwelling.
|
|
Front view of the structure
Date: 1st May 2007 Beams are planked on site, boards are reclaimed
|
|
Front view of Chris and Owen's dwelling
Date: 1st May 2007 Owen and Chris in the structure; Chris making noggins. You can see our new solar panels charging up Owen's drill
|
|
Chris and Owen's dwelling - interior
Date: 1st July 2005 Settled in
|
|
A temporary roof
Date: 1st May 2005 A tarpaulin keeps the weather out so we can build inside
|